Structural loads in Maryland: 70 or 75 feet, and when a permit applies

A structural load can move in Maryland with no permit, up to a point: MDOT SHA’s published rule says 70 feet by daylight, and its answer to Permigo by phone said 75. Here are both, and where a load needs a permit again.

9 min read·Last updated October 23, 2026· Checked against the Maryland Transportation Article, COMAR and MDOT SHA’s limits page, Hauling Permit Manual and Motor Carrier Handbook, and with MDOT SHA by phone
Jump to a section
  1. The short version
  2. What counts as structural
  3. 70 or 75 feet
  4. What the figure measures
  5. When it needs a permit
  6. Overhang limits for other loads
  7. Flags and lamps
  8. Where Permigo comes in
  9. Who to call
  10. Common questions

Steel beams, girders and precast often run longer than the trailer carrying them. In Maryland, a structural load like that can move with no permit, but how long it can be depends on whom you ask. MDOT SHA’s pages say 70 feet, by daylight. MDOT SHA told Permigo by phone on October 23, 2026 that it’s 75 feet. This guide sets out both, what the figure measures, and where a load needs a permit again.

The short version

A structural load, one that can’t be taken apart, needs no Maryland permit for its length or overhang up to a point. MDOT SHA’s published rule puts that point at 70 feet, by daylight. MDOT SHA told Permigo by phone on October 23, 2026 that structural loads up to 75 feet need no permit. Under both, a beam over 75 feet needs one, and so does a load too wide, too tall or too heavy. Every other load is held to 3 feet past the front and 6 feet past the rear. Permigo files the permit when a load needs one.

What counts as a structural load

A load that can’t be taken apart. Maryland’s law calls it an “indivisible load” (Transportation Article §24-105(a)). Permigo’s calculators use this list in their Structural material box:

  • Steel beams, I-beams and girders
  • Precast or prestressed concrete beams, girders and piles
  • Steel columns and trusses
  • Pipe
  • Poles and pilings

Not structural:

  • Machinery and equipment
  • Anything that can be cut or taken apart into shorter pieces

70 or 75 feet: MDOT SHA’s two answers

MDOT SHA’s written rule allows 70 feet by daylight, and its answer to Permigo by phone was 75 feet. They differ in two places: between 70 and 75 feet, and at night.

MDOT SHA’s limits page lets an indivisible load up to 70 feet move by daylight without a permit, and its Hauling Permit Manual applies that to steel beams: “No permit required,” by daylight only. Maryland’s law says the same in §24-105(a) and §24-104.1(c).

On October 23, 2026, MDOT SHA told Permigo by phone that structural loads up to 75 feet are exempt from a permit, and that any other load not on the exempt list needs one past 3 feet in front or 6 feet behind.

A structural load under the written rule and the phone answer (MDOT SHA limits page and manual, read October 23, 2026; MDOT SHA by phone, October 23, 2026)
Beam lengthBy daylightAt night
Up to 70 feetNo permit, under bothWritten rule: a permit. The phone answer named no hours
Over 70, up to 75 feetWritten rule: a permit. Phone answer: no permitWritten rule: a permit. The phone answer named no hours
Over 75 feetA permit, under bothA permit, under both

Permigo’s calculators follow the phone answer and add no daylight limit: tick Structural material and a load up to 75 feet passes Maryland without a permit, as long as its width, height and weight are legal. For a beam between 70 and 75 feet, or one moving at night, the written rule asks for a permit. If you’d rather have one in hand, Permigo files it.

What the 70 or 75 feet measures

The load. The manual gives its steel-beam line as 70 feet “not including the tractor-trailer,” so it measures the beam alone. Permigo’s calculators don’t ask for the load’s own length. They add the trailer and both overhangs instead, which is the longest the load can be when it spans the deck.

Take an invented rig: a 53-foot flatbed carrying a steel beam that reaches 4 feet past the front of the bed and 10 feet past the rear, 67 feet in all.

The 53-foot flatbed, read against Maryland’s rules (an invented example)
ReadingResult
Front: 4 feet against 3Over by 1 foot
Rear: 10 feet against 6Over by 4 feet
Ordinary freightA Maryland permit, for both overhangs
A steel beam: 53 + 4 + 10 = 67 feetUnder 70 feet: no permit by daylight, under both answers
The same beam at nightWritten rule: a permit. The phone answer named no hours
Flags and lampsFlags at all times: the tail is past 4 feet. Lamps in low light

When a structural load needs a permit

Where the exemption stops (MDOT SHA limits page, manual, §24-105, read October 23, 2026; MDOT SHA by phone, October 23, 2026)
WhenWhat happensWhere it says so
Over 75 feetA Maryland permit, under both answersMDOT SHA limits page; MDOT SHA by phone
Over 70, up to 75 feet, or moving at nightA permit under the written rule; the phone answer needs none (and named no hours)MDOT SHA limits page and Hauling Permit Manual; MDOT SHA by phone
Wider than 8 feet 6 inches, taller than 13 feet 6 inches or over 80,000 lbA permit for the width, height or weight. The exemption covers length and overhang onlyTransportation Article §24-105(a), §24-104.1(c); MDOT SHA limits page
A load that can be cut or taken apart, or machineryNot a structural load: past 3 feet in front or 6 behind, a permit§24-105(b), (c); MDOT SHA by phone

Maryland’s overhang limits for other loads

Every load the exemption doesn’t cover is held to §24-105 of the Transportation Article. On a tractor-trailer, front overhang is how far the load reaches past the front of the trailer bed, not past the truck’s grille or hood. The rear counts from the end of the bed or body, not the bumper.

Maryland’s overhang limits by vehicle (§24-105, read October 23, 2026)
VehicleFrontRearWhere it says so
Any truck, trailer or car3 feet past the front of the vehicle6 feet past the rear of the bed or body§24-105(b)(1), (c)(1)
Stinger-steered automobile transporter4 feet6 feet§24-105(b)(3), (c)(1)
Other automobile or boat transporter3 feet4 feet, with a fluorescent flag at least 18 inches square on the vehicle that hangs out§24-105(c)(2)
Garbage or recycling truck with front-end loading arms, while collectingNo front limit6 feet§24-105(b)(2)

MDOT SHA’s limits page says the same: “Load extensions- Max front 3’ Max rear 6’ (except for indivisible cargo).” The law leaves out a few other loads too:

Other loads Maryland exempts (§24-105(a), §24-104.1(c), MDOT SHA handbook, read October 23, 2026)
LoadHow far it can run without a permitWhere it says so
An indivisible load on a combinationUp to 70 feet long, by daylight§24-105(a)(2), §24-104.1(c)(2); MDOT SHA limits page
Piling, poles or mill logs on a single vehicleNo overhang limit§24-105(a)(3)
Piling, poles or mill logs on a combinationUp to 75 feet long§24-105(a)(4), §24-104.1(c)(1); MDOT SHA handbook
Wooden roof trusses, carried upside downUp to 10 feet past the rear§24-105(a)(1)
Nursery stock, or crew or racing shellsNo overhang limit§24-105(a)(3), (4)

Since April 8, 2013, piling, poles and mill logs over 75 feet have needed a permit (MDOT SHA Motor Carrier Handbook).

Flags and lamps still apply

The exemption covers the permit, not the marking. A tail of more than 4 feet needs flags at all times and lamps in low light.

Marking an overhanging load (§22-213, COMAR 11.04.02.03, read October 23, 2026)
WhenWhatWhere it says so
A load more than 4 feet past the rear, or more than 6 inches past a sideRed or orange fluorescent flags at least 18 inches square, at all times, at each point a lamp is required§22-213(d), (e)
A load more than 4 feet past the rear, in low lightA red lamp on each side marking the end, and two red lamps and two red reflectors on the rear. Low light is §22-201.1’s: whenever people and vehicles can’t be seen clearly 1,000 feet ahead§22-213(a), (c)
A permit load longer than legalWarning flags; a single flag at the extreme rear if the part that hangs out is 2 feet wide or lessCOMAR 11.04.02.03 J
A permit load at night with a rear overhang over 4 feetTwo red lights at the end of the overhang and one on each sideCOMAR 11.04.02.03 K

Where Permigo comes in

A structural load inside the exemption has no permit to buy, so not every long load is a filing. Send Permigo the load: what it is, how long, the trailer and the tail, the width, height and weights, and the route. If the exemption covers it, Permigo tells you so from those details and charges nothing. If it doesn’t, Permigo files the Maryland permit with MDOT SHA for $20, with the state’s fee billed at cost. Maryland’s widths, heights, escorts and travel hours are on Permigo’s Maryland oversize permit page.

To check a load yourself, the limits check has a Structural material box that applies MDOT SHA’s 75-foot phone answer.

Get a Maryland permit quote →

Who to call

Permigo checked the contact details below on October 23, 2026.

Who to ask about what (MDOT SHA Motor Carrier Handbook, read October 23, 2026)
QuestionWho answers it
Questions for MDOT SHA about a Maryland permitMDOT SHA Hauling Permits Unit, Hanover: (410) 582-5734
Maryland’s other permit and escort rulesThe Maryland page
Whether a load is exempt, and filing the permit when it isn’tPermigo: +1 (786) 494-6912, 7am–7pm CT, seven days a week, or send a message

Next: Maryland’s permit and escort rules →

Common questions

Do structural loads like steel beams need a permit in Maryland?

It depends on the length and when the load moves. MDOT SHA’s limits page and Hauling Permit Manual treat a steel beam as an indivisible load: no permit up to 70 feet, by daylight only. MDOT SHA also told Permigo by phone on October 23, 2026 that structural loads up to 75 feet need no permit. Both agree that a beam up to 70 feet needs no permit by daylight and one over 75 feet needs one. Between 70 and 75 feet, or at night, the written rule asks for a permit; Permigo files one if you want it in hand.

What counts as a structural load in Maryland?

A load that can’t be taken apart: steel beams and girders, precast concrete beams and piles, steel columns and trusses, pipe and poles. That’s the list in Permigo’s calculators, and it follows Maryland’s own word for these loads, “indivisible” (Transportation Article §24-105(a)). Machinery doesn’t count, nor does anything that can be cut or taken apart into shorter pieces. Piling, poles and mill logs have their own line in the law, up to 75 feet on a combination.

What does the 70 or 75 feet measure?

The load. MDOT SHA’s Hauling Permit Manual gives its steel-beam line as 70 feet “not including the tractor-trailer.” Permigo’s calculators don’t ask for the load’s own length, so they add the trailer and both overhangs, the longest the load can be when it spans the deck: a 53-foot flatbed with a beam 4 feet past the front of the bed and 10 feet past the rear is 67 feet.

How far can other loads overhang in Maryland?

3 feet past the front of the vehicle and 6 feet past the rear of the bed or body (Maryland Transportation Article §24-105). On a tractor-trailer, the front counts from the front of the trailer bed, not the truck’s grille or hood. Past either, the load needs a permit unless it’s exempt. Besides structural loads, the law exempts piling, poles and mill logs, roof trusses carried upside down (up to 10 feet past the rear), nursery stock and racing shells.

Do structural loads need flags or lamps in Maryland?

Yes. The exemption covers the permit, not the marking. A load more than 4 feet past the rear, or more than 6 inches past a side, needs a red or orange fluorescent flag at least 18 inches square at each end point, at all times (Transportation Article §22-213). Past 4 feet at the rear, it also needs red lamps and reflectors whenever people and vehicles can’t be seen clearly 1,000 feet ahead (§22-201.1). A permit load at night with more than 4 feet of rear overhang shows two red lights at the end and one on each side (COMAR 11.04.02.03).

Does overhang count toward Maryland’s length limit?

Yes. Maryland counts any part of the load past the vehicle in its length (Transportation Article §24-104.1(b)). A truck tractor with one semitrailer has no overall cap; the semitrailer may be 48 feet, or up to 53 feet on the Interstates and Maryland’s truck route system (§24-104.1(i); MDOT SHA limits page). A truck pulling a trailer is capped at 62 feet and most other combinations at 55 feet (§24-104.1(j)). Piling, poles and mill logs up to 75 feet, and an indivisible load up to 70 feet, are outside these caps (§24-104.1(c)).

How much does a Maryland permit for a structural load cost?

A load the exemption covers has no permit to buy. For one that needs a permit, Permigo’s fee to file it is $20, and MDOT SHA’s own fee is billed at cost on top; Maryland’s figure is in Permigo’s cost guide. From the load details you send, Permigo also tells you, free, whether a long load is exempt.

Who do I call about Maryland hauling permits?

The MDOT SHA Hauling Permits Unit in Hanover: (410) 582-5734, the line MDOT SHA’s Motor Carrier Handbook gives for oversize and overweight permits (checked October 23, 2026). Permigo answers at +1 (786) 494-6912, 7am–7pm CT, seven days a week, says whether a load is exempt and files the permit when it isn’t. Maryland’s other rules are on Permigo’s Maryland page.

Related guides
Cost

Oversize permit cost by state

What each state charges for a single-trip permit, Maryland included, and how the 13 formula states price.

9 min read

Structural load headed through Maryland? Send the dimensions.

$20 flat Permigo fee per permit, the state’s fee at cost. Permigo tells you free whether the exemption covers the load, and files the Maryland permit when it doesn’t. A permit agent answers, 7am–7pm CT, seven days a week.