CostWhat each state DOT actually charges for a single-trip OS/OW permit — all 48, and why thirteen of them cannot be reduced to one number. Searchable, sortable, every figure dated and linked to its source.
- Flat-rate states, low to high
- $6 – $75
New Hampshire is lowest at $6, Ohio highest at $75. Thirteen states do not use a flat rate at all — they price on weight, width, envelope or distance.
WeightGross, single, tandem, tridem and quad for all 48, the bridge formula worked through, and the two states where the legal gross rises with the axle count — Michigan reaches 164,000 lbs at eleven. Plus what each state charges to go over.
RulesThe federal baseline is 8'6" wide, 13'6" high, 53' trailer and 80,000 lbs — but that height figure is only right in about half the country. Where states go stricter, and the divisible-load rule that gets drivers ticketed.
EscortsEscort rules are a function of dimension and road tier — the same load can need a front escort on a two-lane and a rear escort on a multilane. Plus night, weekend and holiday blackouts.
RulesThere is no federal definition — each state sets its own trigger, and they range from 14 to 18 feet wide. All 48 states’ triggers on width, height, length and weight, plus the 26 published review windows.
West VirginiaOn October 1, 2026 West Virginia replaced WV GotPermits with WVTRIPS. Every carrier needs new accounts, permits issued before the switch did not carry over, and the fees and rules stayed where they were.
DeliveryWhat the driver gets when Permigo files a trip: one texted link with the route map, every state’s permit, an AI summary and the escort cars, shown on a Miami to Houston run on I-95 and I-10.
OhioThe Ohio Turnpike issues its own oversize permit, apart from ODOT’s, with its own limits and fees. Until January 2, 2027 it takes nothing over 10 feet wide or 13 feet 6 inches high.
IllinoisThe Illinois Tollway issues its own oversize and overweight permit, apart from IDOT’s. Over 12 feet wide is a superload there, and oversize loads move in daylight, Sunday until noon.
South CarolinaWithin SCDOT’s self-issue limits a single-trip permit is issued as soon as Permigo files it. Past them, SCDOT reviews it by hand, about a business day behind in Permigo’s experience. Also: annual permits, superloads, over 16 feet wide.
KansasThe Kansas Turnpike Authority issues no permit, but it sets its own limits: its go-ahead over 12 feet wide or 125 feet long, and Monday to Thursday only, with an escort, over 14 feet wide.
GeorgiaGeorgia issues no oversize permit until your insurance certificate is on file with the Department of Public Safety. What the holder line and the policy dates must say, and how much coverage the rule sets.
TexasA Houston move can need permits from TxDMV, the City of Houston and Harris County. Who issues which, the 14-foot cap inside the 610 Loop, the toll lanes closed to permits, and the curfew question.
CaliforniaCalifornia lets structural loads up to 80 feet, such as steel beams, poles and pipes, move with no length permit. The guide covers what the 80 feet measures, the two rear overhang rules that still apply, and where a load needs a permit again.
FloridaNo single 12-foot cap: FDOT limits width at named toll plazas and ramps, from 9 to 15 feet, sends loads over 12 feet to named lanes, and lists the Turnpike’s low overpasses.
MarylandSteel beams, girders and other structural loads can move in Maryland with no permit. The guide sets MDOT SHA’s 70-foot daylight rule beside its 75-foot phone answer, and covers what the figure measures, the 3- and 6-foot overhang limits, and flags.
TexasA DFW move can need permits from TxDMV, Dallas County and Tarrant County. Who issues which, the highways inside Loop 12 and the I-820 loop that take no permits, the Tarrant County curfew and what TxDMV’s sheets say about Dallas.